Keeyask WTP Switching Station Control Building
Project Details
Project Name: Keeyask WTP Switching Station Control Building
Client: Voltage Power
Project Manager: Hans E. Boge, P.Eng.
Project Initiation: 2016
Project Completion: 2018
Project Description
Boge & Boge provided the structural, mechanical engineering and managed the electrical and geotechnical engineering services required to produce construction drawings for this modular water treatment for a Manitoba Hydro construction camp for a multi year project.
Supply water for a camp for a Hydroelectric dam. 60 cubic meter per day treatment capacity. Boge & Boge served as Prime Consultants for this design build work. Boge & Boge provided engineering support for a design build contract and provided engineering design and drawings including:
Site Plan | General Arrangements | Structural & Building Layout | P&ID | Mechanical, Piping, HVAC | Electrical
We worked with the contractor and their suppliers to facilitate construction of the project in Winnipeg, and then ship the components north (750 km) to a camp site at the construction of a new Hydroelectric dam.
This facility can be relocated to another site once the need for it at the camp site is no longer required.