Keeyask WTP Switching Station Control Building

Project Details

Project Name: Keeyask WTP Switching Station Control Building

Client: Voltage Power

Project Manager: Hans E. Boge, P.Eng.

Project Initiation: 2016

Project Completion: 2018


Project Description

Boge & Boge provided the structural, mechanical engineering and managed the electrical and geotechnical engineering services required to produce construction drawings for this modular water treatment for a Manitoba Hydro construction camp for a multi year project.

Supply water for a camp for a Hydroelectric dam.  60 cubic meter per day treatment capacity.  Boge & Boge served as Prime Consultants for this design build work. Boge & Boge provided engineering support for a design build contract and provided engineering design and drawings including:

Site Plan     |     General Arrangements     |     Structural & Building Layout     |     P&ID     |     Mechanical, Piping, HVAC     |     Electrical

We worked with the contractor and their suppliers to facilitate construction of the project in Winnipeg, and then ship the components north (750 km) to a camp site at the construction of a new Hydroelectric dam.

This facility can be relocated to another site once the need for it at the camp site is no longer required.