Eastside Industrial Coatings Addition

Project Details

Project Name: Eastside Industrial Coatings Addition

Client: Triple D Developments

Project Manager: Hans E. Boge, P.Eng.

Boge Resources: Tyler Hiebert (Design Manager & Project Coordinator)

Diaser Resources: John Mueller (Construction Manager)

Square Footage: 30,000 ft2

Project Initiation: 2021

Project Completion: 2023


Project Description

Diaser Management (2006) Ltd. provided design and construction of a new 30,000 sqft building addition and adjacent 1,000 sqft link at the Eastside Industrial Composites manufacturing facility located at 2262 Springfield Road in Sunnyside, Manitoba. 

The project provided a connection between two existing buildings and undertook modifications to the exiting building’s heat, power and sprinkler systems.  Construction needed to be coordinated with exiting manufacturing needs, timelines and climatic conditions including a site electrical shutdown to facilitate power upgrades.