Electrostatic Precipitator - EPCM Project

Project Details

Project Name: Electrostatic Precipitator - EPCM Project

Client: Potash Corporation Saskatchewan (now Nutrien), Rocanville SK

Project Manager: Paul H. Boge, P. Eng.

Project Initiation: 2013

Project Completion: 2015


Project Description

EPCM Contract for Engineering Design & Construction Management of a new electrostatic precipitator.

Vendor led process design, detailed process, mechanical, structural, electrical design & procurement of all aspects including schedule & procurement tracking. 

Facilitate 40 ton lift of mechanical equipment.

Boge prepared the capital cost, and provided preliminary and detailed engineering, ancillary equipment procurement, and complete construction management for the installation of a new electrostatic precipitator at a potash mine in Saskatchewan.

The project needed to be designed around an existing conveyor while loading of potash continued immediately adjacent to our project. This environmental project was further constrained by having minimal site access. The project was completed under budget. The following are services provided:

Structural, mechanical, electrical, instrumentation and controls engineering  |  Equipment procurement  |  Tendering

On-site construction management from mobilization through to commissioning  | Engineering support  | Completed under budget


Previous
Previous

Cochenour Arena Life Extension

Next
Next

Brine Management - EPCM Project