Griffin Wheel Transformer #2
Project Details
Project Name: Design Build of the Platform for Griffin Wheel Transformer #2
Client: Shermco
Project Manager: Dallas Moffat, P. Eng.
Boge Resources: Hans E. Boge, P. Eng. (Project Sponsor)
Sub-Consultants: Diaser Management (2006) Ltd. (Construction)
Project Initiation: 2018
Project Completion: 2019
Project Description
Boge & Boge (1980) Ltd. provided the Design-Build of the Platform required for Griffin Wheel Transformer #2 Change Out.
The client required the change out of a 25 ton electrical transformer during a planned maintenance shutdown.
Boge’s design and construction methodology decreased the transformer change out time from 14 days during a previous outage to 4 days.
Boge’s scope of services for the project included:
Site Assessment | Engineering Design & 3D Model of the Platform | Construction Plan & Methodology including the use of Modular Construction Techniques
Site Preparation work in advance of main shutdown | Construction Management | Structural Steel Installation | Masonry wall removal and rebuild | Site Coordination