MINING DESIGN & CONSTRUCTION SERVICES

The Boge-Boge team has the capability of conducting mine designs in the following commodities (Properties shown have had a component of design conducted by members of the Boge Team):

  • Iron Ore
    • Wabush Mines Ltd.
    • Iron Ore Company Of Canada
    • Hibbing Taconite
  • Zinc
    • Balmat Zinc Mine
    • Newfoundland Zinc Mines
    • Myra Falls
    • HudBay Minerals Trout Lake
  • Nickel/Copper
    • Stobie Mine
    • Creighton Mine
    • South Mine
    • Thompson 1D Mine
    • Birchtree Mine
  • Gold
    • Renabie Gold Mines
    • Goldcorp Red Lake Mine
    • Goldcorp Opinaca Mine
    • Kubi Gold Deposit
    • Phoenix Gold Project
  • Uranium
    • West Bear Project
    • Denison Arizona Project

Underground Mining Methods Used:

  • Room and Pillar
  • Open Stoping
  • Cut and Fill
  • Mechanized Cut and Fill
  • Vertical Retreat Mining
  • Narrow Vein Mining
  • Raise Platform Mining

When designing these mining processes, there are components that are complimented by the Boge-Boge infrastructure team. These are (and not limited to):

  • Chutes
  • Material Sizing (grizzlies and rock breaker stations)
  • Bulkheads for underground slimes disposal
  • Crusher Stations
  • Conveyor Galleries
  • Bins
  • Loading Pockets
  • Dewatering Stations
  • Shaft Refurbishment
  • Hydraulic Take-up for Underground Conveyors

Sample of Projects Conducted by Boge Team Members

Beaufield Resources Inc
Quebec, Canada
Conduct a rapid Preliminary Economic Assessment of the re-opening of the Balmat Zinc Mine in New York, USA. The work involved developing Capital and Operating Costs, Stoping strategy, reviewing the current data and producing data for a cash flow analysis
Rubicon Minerals Corp
Ontario, Canada
Oversee the Preliminary Economic Assessment of the Phoenix Gold Project. This involved major infrastructure development costs, mill and paste plant designs, and the mine design. All aspects for the completion of the PEA was included in this process
Alexis Minerals Corp.
Manitoba, Canada
Project was to conduct a preliminary assessment (PA) of the Snow Lake Mine (SLM) property (formerly the New Britannia Mine), based primarily upon three NI 43-101 Technical Reports prepared by Micon International Limited (Micon) (Micon, 2006; Micon, 2008, and Micon, 2009). The full mine design, metallurgy, social aspects, rock mechanics and economic analysis was completed.
Vale Inco Thompson
Manitoba, Canada
Project involved the mine design of the Birchtree 84 Deep and the Birchtree 85 Orebody. All aspects of mining were considered and the level of study was at preliminary assessment to feasibility. At the end of the exercise, the team chose one mining method for each area and the technical direction to achieve the required tonnage.
Vale Inco Thompson
Manitoba, Canada
Project involved the mine design of the 1-D Upper area, the South Extension 1-D, the 1-D Deep, the North Deep and ancillary areas of the Thompson 1-D Mine. All aspects of mining were considered and the level of study was at preliminary assessment to feasibility. At the end of the exercise, the team chose one mining method for each area and the technical direction to achieve the required tonnage.
PMI Gold Corporation Kubi Project
Ashanti District, Ghana
Project involved the preliminary assessment of an underground gold mine near the Ashanti District in Central Ghana. The entire feasibility was managed from reserve estimation through tailing disposal and included an environmental review. Our success with the project led us to be sole –sourced for the detailed design and construction of the mine.
Hibbing Taconite Transportation Study
Minnesota, USA
This Cleveland Cliffs subsidiary requested an update to a project on a 13 mile distance between the iron ore pit and the processing plant. It involved reviewing what was done and what technical direction could be the best solution.
UEX West Bear Project
Saskatchewan, Canada
The uranium market has made very small deposits attractive to exploit and this project showed the great potential even with amine life measured in months. Using appropriate technology, the team put a mine plan together that maximized the recovery and minimized the impact to the environment. This made the project much more saleable.
Denison Mines Limited
Arizona, USA
The Arizona 1 project was designed as a 6-700 tpd operation that would operate through a very small shaft. The design team explored various options and recommended a small trackless solution for this style of ore body. The major influence on this decision was regulatory demands of lower noise thresholds
Klondike Star
Yukon, Canada
Scoping Study of a placer/lode gold deposit near Dawson City in the Yukon.
Golden Pocket Resources
Manitoba, Canada
Conducted a scoping study on the mine design and surface infrastructure for a small scale gold mine in the Bissett Gold Mining Camp.